Learn

From a floor plan to rentable area results

Classify a floor plan once; choose the standard separately. Here's the five-step path from an uploaded CAD drawing to a Global Summary of Areas.

The usual way to go from a floor plan to a rentable area figure involves a CAD drawing, a separate area-takeoff spreadsheet, and someone keeping the two in sync by hand every time a space gets reclassified. This is the shorter path.

Classification and calculation, kept separate on purpose

A floor plan gets classified once — each region tagged with what it physically is: tenant area, common area, a vertical penetration, an amenity. That classification doesn't depend on which measurement standard you ultimately want. The standard and method (BOMA Office 2024, REBNY, or another standard the engine already reproduces from that standard's own worked examples) is chosen separately, and that choice decides how the already-classified geometry gets interpreted — what counts toward usable area, what gets excluded, what feeds into an allocation pool. Change the standard, and the same classified floor plan produces a different Global Summary, without being redrawn.

Five steps, one source of truth

  1. Upload the floor plan — Upload the CAD drawing for a floor — the drawing you or your architect already produced, viewed directly in the browser.
  2. Classify each space — Tag each region on the plan with what it physically is — tenant area, common area, vertical penetration, amenity, and so on — once, independent of any one standard.
  3. Choose the standard and method — Pick the measurement standard and edition that applies to the building — every BOMA edition and REBNY are supported. See all standards.
  4. Generate the Global Summary of Areas — The classified geometry runs through that standard's own allocation rules automatically, producing the floor and building totals, the load factor, and (for a campus) the inter-building allocation.
  5. Export the PDF — Download a client-ready PDF of the area summary or the floor plan itself, directly from the browser.

Because the Global Summary is generated fresh from the current classified geometry every time — not from a spreadsheet someone updates separately — reclassifying one space after the fact updates every downstream total automatically: the floor total, the building total, the load factor, and any inter-building allocation across a campus.

See inter-building allocation for how shared campus amenities factor in, or all standards for the specific rules each supported edition applies once a plan is classified.

Frequently asked questions

Do I have to re-classify a floor plan for every standard I want to check it against?

No — that's the point of keeping classification separate from calculation. The same classified floor plan can be reinterpreted under a different method or edition without redrawing or reclassifying anything.

What if I reclassify a space after the Global Summary is already generated?

Every downstream total updates automatically, because the Global Summary is generated from the current classified geometry each time, not from a separately maintained spreadsheet that has to be kept in sync by hand.

Does this work for a multi-building campus with shared amenities?

Inter-building allocation's calculation logic is built and verified against each standard's own worked examples — spreading shared amenity and service area across eligible occupants on a multi-building campus. See inter-building allocation.

Check this against your own floor plan

RentableArea.com produces these results from your own measured floor plan, building by building.